0
home

Primary Clarification of Dairy Effluents

home
Primary Clarification of Dairy Effluents
Primary Clarification of Dairy Effluents
Price And Quantity
  • 1
  • Unit/Units
    Product Specifications
    • Wastewater Treatment Plant
    • Industrial
    • Mild Steel
    Product Description

    Primary Treatment by Dissolved Air Flotation are used in removing the bacterial containment in sewage water. These are manufactured by implementing supreme quality materials in total compliance with set industry standards. These Primary Treatment by Dissolved Air Flotation are widely acclaimed by the customers due to their longer functional life, easy handling & installation and low maintenance.  In addition to this, we provide  customization as per the specifications laid down by the customers at market leading prices.

    Specifications

    Minimum Order Quantity

    1 Piece

    Feed Flow Rate (cubic-meter/day)

    120 m3 to 29

    Type

    Circular

    Inlet TSS (Mg/L)

    Up to 2000 ppm

    Treatment Capacity

    5m3/hr to 1250m3/hr

    Treatment Capacity (m3/h)

    5 m3/hr to 1250 m3/hr

    Water Source

    Industrial Effluent, Commercial Waste Water, Municipal Sewage

    Industry

    Paper Mills, Leather Industry, Pharmaceutical Industry, Automobile, Dairy Industry, Slaughter House, Chemical/Petroleum Industry

    Air flow rate(m3/h)

    Depends on the Floatcell size

    Surface Area (m2)

    1.02 m2 to 197.95 m2

    Applicable Industry

    Chemical Industry, Oil refining Industry, Slaughter House, Food Industry

    Treated Water Quality

    TSS 100 ppm or less

    Dimensions (Mtrs)

    Dia 1.2 meter to 16.8 meter

    Treatment Stages

    Preliminary Treatment, Primary Treatment

    Bridge Type

    Half Bridge, Full Bridge

    Installation Type

    Prefabricated

    Tank Diameter

    1.2 meter to 16.8 meter

    Dimensions (in meters)

    Diameter 1.2 meter to 16.8 meter

    Volume (in cubic-meters)

    0.225 m3 to 62.37m3

    Hydraulic Loading

    9.6 m3/m2/hr

    Solids Loading

    16 kg/m2/hr

    Tank Height

    650 mm

    Installation/Civil Work

    Installation Available

    Approximate Power Consumption (in kW)

    Depends on Floatcell Size

    Manufacturing Lead Time

    3 months

    Material of Construction

    PU-coated MS, SS 304, SS316, SS316L, Duplex Steel

    Diameter

    1.2 to 16.8 meter

    Max. Capacity Excluding Recycle

    1247 m3/hr.

      

    Trade Information
    • 12 Week
    Related Products























    right arrow
    left arrow
    Contact Us

    Saidpura, Barwala Road, Industrial Park Block B, Dera Bassi, Punjab, 140507, India
    Phone :+918045812342